NTPC Partners with Rosatom & EDF for Mega Nuclear Projects: India Targets 100 GW by 2047

NTPC is making a massive pivot from coal to carbon-free baseload power. As of Friday, January 2, 2026, India’s state-owned power giant has signed non-disclosure agreements with Russia’s Rosatom and France’s EDF. This isn’t just another MOU; it’s a strategic hunt for the next generation of large-scale Pressurised Water Reactors (PWRs). The thing is, India […] The post NTPC Partners with Rosatom & EDF for Mega Nuclear Projects: India Targets 100 GW by 2047 first appeared on Business League.

NTPC Partners with Rosatom & EDF for Mega Nuclear Projects: India Targets 100 GW by 2047

NTPC is making a massive pivot from coal to carbon-free baseload power. As of Friday, January 2, 2026, India’s state-owned power giant has signed non-disclosure agreements with Russia’s Rosatom and France’s EDF. This isn’t just another MOU; it’s a strategic hunt for the next generation of large-scale Pressurised Water Reactors (PWRs).

The thing is, India has set a “Viksit Bharat” target of 100 GW of nuclear power by 2047.Or nothing. Let’s be real, we are currently sitting at just over 8 GW. To bridge that gap, NTPC is being drafted as the “heavy hitter” alongside the traditional monopoly, NPCIL. Those too.

Also Read |Tamil Nadu Voter List Purge: 97 Lakh Names Deleted in SIR Phase 1

The “Nuclear Pivot” Log: Field Notes

NTPC isn’t just looking to buy tech; they’re looking to own the lifecycle.

  • The Global Giants: Rosatom (think Kudankulam-style tech) and EDF (who have been eyeing the Jaitapur project for years) are the primary targets for the “Heavy” 1,600 MW projects.

  • The Goal: To build 30 GW of nuclear capacity under the NTPC banner over the next two decades.

  • Indigenisation: NTPC wants to move past “turnkey” projects. They are pushing for local manufacturing and supply-chain “absorption”—basically, making sure the parts are made in India, even if the design is French or Russian.

Also Read |Tamil Nadu Voter List Purge: 97 Lakh Names Deleted in SIR Phase 1

Policy Breakthrough: The SHANTI Act 2025

And here’s the kicker: this rush of activity is happening because the government just cleared the SHANTI Act (Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India) in December 2025.

  • The Monopoly Ends: The act officially dismantled the 60-year state monopoly, allowing private and public sector players to take up to a 49% equity stake in nuclear projects.

  • Liability Fix: It overhauls the “Supplier Liability” headache that kept US and French firms away for a decade. Now, the liability sits primarily with the operator, making international deals much easier to sign.

Also Read |Tamil Nadu Voter List Purge: 97 Lakh Names Deleted in SIR Phase 1

Small Reactors, Big Plans

It’s an ongoing situation where size isn’t the only thing that matters.

Basically, NTPC is evolving from a “thermal giant” into a “diversified energy vehicle.” If they pull this off, nuclear could move from a 3% niche to a 10%+ backbone of the Indian grid by 2040.

Also Read |Tamil Nadu Voter List Purge: 97 Lakh Names Deleted in SIR Phase 1

End…

The post NTPC Partners with Rosatom & EDF for Mega Nuclear Projects: India Targets 100 GW by 2047 first appeared on Business League.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow

Economist Admin Admin managing news updates, RSS feed curation, and PR content publishing. Focused on timely, accurate, and impactful information delivery.